x
Breaking News
More () »

Waco Mall-to-Mall Project continues with closure of SH 6 Frontage Road bridges

These closures will not occur at the same time, as stated by the City of Waco.

WACO, Texas — The City of Waco is continuing its Mall to Mall project with the closure of SH 6 mainlanes as crews workers construct new frontage road bridges.

 At 6 a.m., crews will close the outside eastbound SH 6 mainlane at Beverly Drive for the morning, according to the city. Then, crews will close the outside westbound SH 6 mainlane at Beverly Drive for the afternoon. 

These closures will not occur at the same time. Additionally, crews will perform full mainlane closures starting July 27, to remove brackets and install conduit on the new Bagby U-turn bridge. 

These closures will not occur concurrently and are scheduled to be active nightly from 7 p.m. to 7 a.m., and will end July 30.

Westbound closures :

  • SH 6 westbound mainlanes from N Old Robinson Road to the westbound on-ramp of SH 6 just before Beverly Drive.
  • Westbound on-ramp to SH 6 before the I-35 intersection; westbound on-ramp to SH 6 before Bagby Avenue. 
  • Westbound frontage road right after the on-ramp to SH 6 before the Beverly Drive railroad. 
  • The direct connector from northbound I-35 to westbound SH 6. (Closures active from 8 p.m. to 7 a.m. on weeknights; 10 p.m. to 10 a.m. on Friday nights)

Eastbound Closures :

 • SH 6 eastbound mainlanes from the off-ramp to Exchange Parkway to the off-ramp just past Bagby Avenue (Legend Lake Parkway). 

  • The eastbound on-ramp to SH 6 prior to Bagby Avenue will be closed.

More on KCENtv.com:

Before You Leave, Check This Out